The result of a microcement floor is decided before the first bucket is opened: when the substrate is assessed. These are the points we check on every site visit.

Living room with a microcement floor

1. Assess the substrate

This is the most important step. You need to know what it will be applied on and what state it is in:

  • Loose tiles: fixed first. If they move later, the microcement cracks.
  • Grease or dirt: prevent adhesion.
  • Unevenness: above 2 mm, self-levelling screed first.
  • Damp in the substrate: if it rises from the ground, it must be waterproofed first. Microcement protects from above; it does not stop moisture coming from below.

If you hire a company, make sure it carries out this assessment before quoting.

2. No wood

It is not applied over parquet or floating floors. Wood expands and contracts differently and would pass its movements on to the microcement. It has to be removed down to the substrate beneath.

3. Unrendered walls

On bare brick walls, apply a coat of mortar first. That way the microcement does not have to fill holes.

4. Temperature

Substrate and air temperature affect drying and the result. Avoid applying in extreme cold or heat and follow the product data sheet.

5. Underfloor heating

It is compatible and works very well, but you must switch the heating on before application, so the existing screed completes its expansion and, if it is going to crack, does so beforehand.

6. Timings

Walk on carefullyNext day
Put furniture back1–2 weeks
Maximum hardness28 days
Application on a small job≈ 4 days

Request a free quote

FAQ

Frequently asked questions

Can I lay a microcement floor myself?

It is possible, but the result depends heavily on preparation and skill. If you do, choose a ready-to-use product and get advice first.

What if the floor is uneven?

Below 2 mm it is applied directly. Above that, it is levelled first with self-levelling mortar.

When can I use the floor?

Walk on it carefully the next day; furniture after 1 week in summer or 2 in winter; maximum hardness at 28 days.

Questions about your microcement project?